90-day programme terms
Commercial summary revised 27 October 2026. Your signed quotation defines the binding scope.
What does SEK 120,000 include?
The mandatory 90-day programme comprises a physical setup delivered to you (SEK 60,000), 30 engineering hours at SEK 1,500/hour including six agreed experiments (SEK 45,000), and the final technical report and review (SEK 15,000). All prices exclude VAT. Specialist analyses are separately quoted. The setup is not offered alone under this programme.
How are the six experiments defined?
Agree the six experiments, baseline, conditions and measurements before kickoff. The experiments sit within the 30 engineering hours; there is no additional standard six-experiment fee. Any change of scope requires written agreement.
Who operates and owns the equipment?
The physical setup is delivered to your site. Your trained team operates it locally under Percy Roc’s remote guidance. Percy Roc retains ownership. Remote guidance does not replace local operating procedures, operator responsibility or the approved safety controls.
When do the 90 days start?
At the documented kickoff after the signed scope, delivery, commissioning, operator training and required site, safety and conformity approvals. Clicking Start 90-day trial submits no order, takes no payment and does not start the programme clock.
Which analyses are included?
Agree routine measurements and interpretation within the engineering scope. Specialist analyses such as XPS, Raman, SEC/GPC and electrochemical testing are separately quoted with their sample counts and methods.
What if we need more than 30 engineering hours?
Additional engineering is optional and separately quoted. We agree the extra scope and obtain written approval before additional work. Final report preparation and its review are covered by the separate SEK 15,000 fee, not deducted from the 30 hours.
What happens after 90 days?
Receive your final technical report and review, then return the equipment under the agreed arrangements or enter a separate continuation agreement. There is no automatic renewal or ownership transfer.
What must be ready before delivery and use?
The equipment configuration, permitted materials and operating limits, local installation, training and applicable conformity and safety requirements must be approved. Customer-site use is conditional on these prerequisites; this offer does not claim CE conformity or a laboratory exemption.
Are the case-study results guaranteed?
No. Results depend on material and recipe. Earlier case studies do not establish performance of every configuration. IR-camera measurement up to 300°C is a measurement specification, not a verified process-temperature rating.
What does Start 90-day trial do?
It opens an enquiry builder for the mandatory paid programme. Prepare an email draft and send it from your own email application. Percy Roc confirms suitability and issues a quotation; no payment is processed on this site.
Data and IP
Agree confidentiality, project data rights and foreground IP in the signed scope. Percy Roc retains its pre-existing microwave and control IP.